Good morning, Apex Metal Works
Compliance status across all operations — Midland, TX facility
Compliance Score
87%
↑ 4% from last month
Open Actions
3
1 high priority
Training Expiring
2
Forklift cert — due Jul 15
Last Inspection
94%
May 12, 2026 · 0 criticals
Compliance Breakdown
Air Permits (PBR)
92%
Employee Training
90%
Chemical Reporting
100%
Safety Inspections
75%
OSHA Recordkeeping
100%
Open Action Items
Needs attention
Annual PBR Emissions Report
Forklift Recertification — 2 employees
June Monthly Safety Inspection
Regulatory Calendar — Next 90 Days
| Deadline | Requirement | Agency | Status |
|---|---|---|---|
| June 28 | Monthly Safety Inspection | Internal | Due Soon |
| June 30 | Annual PBR Emissions Report | TCEQ | Urgent |
| July 15 | Forklift Operator Recertification | OSHA | Upcoming |
| July 31 | Quarterly Safety Meeting | Internal | Scheduled |
| Sept 1 | Annual HazCom Training | OSHA | On Track |
Action Items
Compliance tasks assigned to Apex Metal Works by 2R Safety Solutions
All Items
3 open · 1 completed this month
Submit Annual PBR Emissions Report to TCEQ
Forklift Recertification — Marcus Webb & D. Castillo
June Monthly Safety Inspection
Update SDS for new welding flux product (Lincoln Electric)
PBR Compliance
TCEQ Permit by Rule — air quality emissions tracking under 30 TAC Chapter 106
Annual Report Due June 30, 2026
Your annual PBR emissions summary must be submitted to TCEQ by June 30. Ryan @ 2R Safety is preparing this report. Current emissions are within all permitted limits.
VOC Emissions (YTD)
14.2 tons
Limit: 25 tons/yr
PM10 Emissions (YTD)
2.1 tons
Limit: 5 tons/yr
NOx Emissions (YTD)
18.7 tons
Limit: 25 tons/yr
Permitted Activities
MIG/TIG Welding Operations
ActiveMetal Surface Coating (spray)
ActiveNatural Gas Combustion (boiler)
ActiveParts Cleaning / Degreasing
ActiveReporting History
2025 Annual Report
Submitted2024 Annual Report
Submitted2023 Annual Report
Submitted2026 Annual Report
Due June 30Tier II Chemicals
EPCRA Section 312 — annual chemical inventory reported to TCEQ, Limestone County LEPC & Midland Fire Department
2026 Tier II Report Submitted — March 1, 2026
Report filed on time with TCEQ, Limestone County LEPC, and Midland Fire Department. Next report due March 1, 2027.
Reportable Chemicals On-Site
Above threshold quantities
| Chemical | CAS # | Max Qty | Avg Qty | Storage Location | Status |
|---|---|---|---|---|---|
| Propane | 74-98-6 | 2,000 lbs | 1,400 lbs | Outdoor tank, NW corner | Reported |
| Welding flux (Lincoln) | Various | 500 lbs | 300 lbs | Welding bay storage | Reported |
| Hydraulic oil (ISO 46) | Various | 1,200 lbs | 900 lbs | Maintenance shop | Reported |
| Acetylene | 74-86-2 | 420 lbs | 300 lbs | Cutting station | Reported |
Inspections
On-site safety inspection history — conducted monthly by 2R Safety Solutions
Avg Score (6 mo)
91%
Last 6 inspections
Inspections This Year
5
Monthly cadence
Open Findings
2
From May inspection
Inspection History
94%
May 2026 — Monthly Safety Inspection
May 12, 2026 · Conducted by Ryan @ 2R Safety Solutions
2 findings: Forklift aisle marking worn (floor shop) · Eye wash station needs flush check
97%
April 2026 — Monthly Safety Inspection
April 8, 2026 · Conducted by Ryan @ 2R Safety Solutions
1 finding: Fire extinguisher tag expired — welding bay (corrected same day)
88%
March 2026 — Monthly Safety Inspection
March 11, 2026 · Conducted by Ryan @ 2R Safety Solutions
3 findings: PPE station restocking, lockout/tagout binder outdated, spill kit incomplete
92%
February 2026 — Monthly Safety Inspection
February 10, 2026 · Conducted by Ryan @ 2R Safety Solutions
2 findings: Housekeeping in grinding area, lighting in back storage
82%
January 2026 — Monthly Safety Inspection
January 14, 2026 · Conducted by Ryan @ 2R Safety Solutions
5 findings: post-holiday reset items (all corrected within 2 weeks)
—
June 2026 — Monthly Safety Inspection
Due June 28, 2026 · Ryan will contact to schedule
OSHA 300 Log
Recordable injury & illness log — maintained and filed by 2R Safety Solutions
2025 OSHA 300A Summary Posted February 1 – April 30, 2026
Annual summary posted as required. Total recordable cases: 1. Days away from work: 0. Days on job transfer or restriction: 3.
Recordables (YTD)
0
2026 — zero incidents
Days Away (YTD)
0
2026
Days Restricted
0
2026
Fatalities
0
All time
2025 Recordable Incidents
| Date | Employee | Description | Days Away | Days Restricted | Classification |
|---|---|---|---|---|---|
| Aug 14, 2025 | Employee #7 | Laceration to left hand — metal edge contact, grinding operation | 0 | 3 | Recordable |
Historical: 2024: 0 · 2023: 1 · 2022: 2
Training Records
Compliance training status — all active employees at Apex Metal Works
Training Current
18
of 20 employees
Expiring <30 Days
2
Forklift certification
Overdue
0
All compliant
Compliance by Course
| Training | Required For | Frequency | Compliant | Expiring Soon | Status |
|---|---|---|---|---|---|
| HazCom / GHS (Right-to-Know) | All employees | Annual | 20/20 | 0 | Current |
| Emergency Action Plan | All employees | Annual | 20/20 | 0 | Current |
| PPE Selection & Use | All production | Annual | 16/16 | 0 | Current |
| Forklift Operator | Certified operators | 3-Year | 4/6 | 2 | Expiring |
| Lockout/Tagout (LOTO) | Maintenance | Annual | 4/4 | 0 | Current |
| Confined Space Awareness | Designated employees | Annual | 3/3 | 0 | Current |
| Fire Extinguisher Use | All employees | Annual | 20/20 | 0 | Current |
Employees
Active workforce — Apex Metal Works · 20 employees
Active Employees
20 total
| Name | Job Title | Start Date | Training Status |
|---|---|---|---|
MW Marcus Webb |
Forklift Operator / Fabricator | Mar 2019 | Recert Due Jul 15 |
DC D. Castillo |
Forklift Operator | Jan 2021 | Recert Due Jul 15 |
JO James Okafor |
Welding Lead | Jun 2017 | Current |
TN Teresa Nguyen |
Quality Control | Sep 2020 | Current |
RB Robert Bernal |
Machine Operator | Feb 2022 | Current |
| + 15 more employees | — | — | All Current |
Documents & Reports
Compliance documents and filed reports maintained by 2R Safety Solutions
Your Files
7 documents
2025 Annual PBR Emissions Report
Download
2026 Tier II Report — Limestone County
Download
May 2026 Inspection Report
Download
OSHA 300A Summary — 2025
Download
Emergency Action Plan — Apex Metal Works
Download
SDS Library — All Chemicals On-Site
Download
IIPP — Injury & Illness Prevention Program
Download